![]() ![]() After you put the file there, scan your documents, then just save, go to edit, select reverse pages, save, done. app file of your Applications folder, but the resources will be under Acrobat>Javascripts or Resources>Javascripts. ![]() On the mac, you'll have to open the package file of the. On windows that's programfiles(x86), adobe, Acrobat DC, Acrobat, Javascripts. js (dot js), and save the file to the application file folder where the Javascripts files are located. Put GKaiseril's script into a plain text editor like notepad or textedit, change the format to plain text, then save as, and in windows, save as "ALL FILES", on mac this is not necessary when you give it a name, give it the extension. If not, just click the Name tab and it will reverse their order.Ĥ. ![]() This only works sometimes, but not always.But if your selection works, they will be in reverse order. Back in DC, Create a PDF from multiple files, select them all, starting with the last, holding shift and selecting all the way back to the first. For pages 1-9, add a 0 (zero) before the number at the end of the file name.ģ. Now you want to extract the pages to a folder all their own.Ģ. IF you have a lot of pages, this doesn't work well.ġ. I added it to the javascripts folder as ReversePages.js and it works just fine. Don't mean to rehash old wounds or old threads, but thank you GKaiseril. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |